Project: water transition to Khavar Shahr
Employer: Maroon Omran Niroo
Project description: transmission of steel casing pipe with diameter of 500 mm and 72 meter long
This project was implemented with pipe jacking method using machine HS700B. Main feature of this project is related to texture of the area where the project was implemented. Fortunately, it was successfully implemented and completed by proper technical calculation and inexhaustible efforts of the Pipe Jacking Association staffs
|